Bolts, nuts, screws, washers
High SKU count, tight tolerance, one governed line.
Grade, size, thread and coating handled as typed specification fields, with MOQ and feasibility answered before a delivery promise leaves the office.
Typed
Grade, size, coating
MOQ
Confirmed at feasibility
Batch
Traceable to dispatch
The friction
What usually breaks in this category.
SKU sprawl
Thousands of variants, and the one the customer wants is always the one nobody has coded.
MOQ discovered late
The order is promised, then the plant says the quantity is below a runnable batch.
Rejections without a trail
A tolerance failure is argued from memory because the inspection lived in a register.
How SysOMS answers it
The configuration that fixes it.
Custom products, auto-coded
Party-specific items get a code at the moment of enquiry, so nothing waits for master data.
Feasibility before promise
Earliest delivery, MOQ and achievable tolerance answered in writing by the plant before the quote goes out.
Quality gate
A held batch cannot be packed. Inspection outcomes stay attached to the batch through dispatch.
Similar operations run on SysOMS too.
System of Marketing & Sales
Put enquiry to dispatch on one governed line.
Tell us how your plant sells today. We'll show you where the line breaks and what it takes to close it.